Solar energy has grown 35 times since 2008 and is now large enough to provide electricity 12 million American homes. Costs are also down 50%, which is now the perfect time to jump into the trend.

Adding solar panels to your home is a worthwhile investment that will provide you with cleaner, more affordable energy. The problem is, many homeowners misunderstand the installation process, believing that it can be completed in a few days.

Placing a solar panel and the components that power it doesn’t take long, but there are other steps to follow. There are regulations to follow, permits to meet, and other steps you need to take. You can extend the time before you can enjoy your new system.

Check out our solar panel installation guide to see how it works, how long it takes, and how much it costs.

Installation of the solar panel

It only takes a few days to obtain and install the material, but there are several bureaucratic aspects of the process, which can take a lot more time.

Before installation

Choosing the right solar company can take a day or a few weeks. It depends on how happy and confident you are with your first choice.

Before beginning installation, a professional should perform a site survey and / or roof assessment to determine where to place the solar panels. This should be done no later than 1-2 weeks after the first service request.

The design process involves the professionals creating a plan of exactly where each solar panel should be placed. You should have a technical-commercial proposal ready for you for a period of 2 days to a week.

If the design complies with all local regulations, you don’t have to worry about filling out any paperwork. If not, you may have to go through an approval process that can take a week or months.

During the installation

The actual installation of the solar modules and the associated components only takes a few days. This will depend on the size and complexity of your roof and the weight of the panels and will range from a single day to about a week.

After installation

After the panels have been placed, they must be connected to the nearest power grid and checked by the local authorities. This can take anywhere from a week to a month.

The solar panel installation process can take up to 90 days if you consider other bureaucratic issues. It varies from case to case, but it can take months to get right.

Installation costs for the solar panel

The average Installation costs for solar modules range from $ 3- $ 5 per watt or $ 15- $ 25,000. Various factors affect this number, including the cost of labor and the size, components, and configuration of the system.

Tax benefits are available for households that use solar energy. You can take advantage of a one-time renewable home energy tax credit that gives you 30% of the total system costs back.

Getting solar panels for your home is an extensive but rewarding process. Check here to get started Installation of solar panels.

Where can I find out more?

Installing solar modules is not just about placing the modules and their associated components. Professionals must also conduct a site survey, create a design, meet licensing requirements, connect to a utility grid, and be approved by local authorities.

Solar energy is a worthwhile investment that will reduce your environmental footprint, allow tax breaks and provide you with years of clean energy.

The more you know about the power of the sun, the easier it will be to see why you need it. Read the rest of our content for more information.

Leave your vote

0 points
Upvote Downvote

Related Articles

Log In

Forgot password?

Forgot password?

Enter your account data and we will send you a link to reset your password.

Your password reset link appears to be invalid or expired.

Log in

Privacy Policy

Add to Collection

No Collections

Here you'll find all collections you've created before.